All reference systems combine a high degree of innovation with equally high quality levels. This was no different thirty years ago. It was possible to execute all projects on an economically viable and sustainable basis despite the high quality expectations. Or was it perhaps because of them?
Development and execution of photovoltaics farms in Germany
Installation data:
10,1 MWp installed output
Project volume:
EUR 46.550.000
Period:
2002 – 2004 planning
2004 – 2005 execution and completion
Services:
Full project development including observance of legal planning requirements, decision on technology to be utilised, invitation for tenders, sourcing of components, retention of prime contractor, construction supervision, quality assurance, acceptance testing, operational management concept.
Owner / representative:
Overall technical responsibility Dirk Stahf for GEOSOL Gesellschaft für Solarenergie mbH
Special factors:
The Leipzig Land project attracted attention in the international media as the world’s largest solar power plant at the time.
Please note:This reference does not describe a project executed by our office. Rather, our management held technical responsibility for the project under former activities.
Development and execution of photovoltaics farms in Spain
Installation data:
151,450 square metre plot of land
20.1 MWp installed output
Project volume:
EUR 175.000.000
Period:
2005 – 2008 planning
2007 – 2008 execution and completion
Services:
Full project development including observance of legal planning requirements, decision on the technology to be utilized, sourcingof components, retention of prime contractor, construction supervision, quality assurance, acceptance testing, operational management concept.
Owner / representative:
Overall responsibility Dirk Stahf for GEOSOL Gesellschaft für Solarenergie mbH
Special factors:
The Spanish market was entered at a very early stage.
Please note: This reference does not describe a project executed by our office. Rather, our management held technical responsibility for the project under former activities.
Development and execution of photovoltaics farms in Italy
Installation data:
188,000 square metre plot of land
3.0 MWp installed output
Project volume:
EUR 20.000.000
Period:
2007 – 2009 planning
2008 – 2009 execution and completion
Services:
Full project development including observance of legal planning requirements, decision on technology to be utilised, sourcing of components, retention of prime contractor, operational management concept.
Owner / representative:
Overall responsibility Dirk Stahf for GEOSOL Gesellschaft für Solarenergie mbH
Special factors:
The Italian market was entered at a very early stage.
Please note: This reference does not describe a project executed by our office. Rather, our management held corresponding responsibility for the project under former activities.
Development and execution of photovoltaics farms in the Czech Republic
Installation data:
83,000 square metre plot of land
3.61 MWp installed output
Project volume:
EUR 14.000.000
Period:
2008 – 2009 planning
2009 execution and completion
Services:
Full project development including observance of legal planning requirements, decision on technology to be utilised, sourcing of components, planning, retention of prime contractor, operational management concept.
Owner / representative:
Overall responsibility Dirk Stahf for GEOSOL Gesellschaft für Solarenergie mbH
Please note: This reference does not describe a project executed by our office. Rather, our management held corresponding responsibility for the project under former activities.
Quality assurance during the construction of the Megasol photovoltaics farm in Italy
System data:
83,000 square metre plot of land
17 MWp installed output
Period:
2010 – 2011 execution and completion
Services:
Negotiations on individual items of the prime contractor contract, quality assurance during construction, support for the planning of the monitoring system
Client:
Photovolt Development Partners GmbH
Organisation of study visits
Travel group:
Employees of Turkish banking major TSKB – Türkiye Sınai Kalkınma Bankası A.Ş.
Period:
Spring 2014, duration of three days
Services:
Full itinerary planning and organisation of the trip, management of transportation, organisation of the content and visit to ten sites (a wide range of different photovoltaics installations and laboratories, consultation with internal and third-party lecturers)
Client:
TSKB – Türkiye Sınai Kalkınma Bankası A.Ş. in conjunction with KfW Entwicklungsbank
Development and construction of a grid-autonomous charging station for a glider station with an innovative integrated solar generator
Purpose:
Grid-autonomous charging station for the batteries for the on-board electronics and aircraft-proximate 230 VAC outdoor supply of power (e.g. use of machinery for repairs)
Period:
Spring 2013
Services:
Design of the energy system, component sourcing, development of an aesthetically pleasing, water tight and thermally insulated solar generator integrated in the roof of the trailer.
Owner / representative:
Stahf Solar Projekke GmbH